Why are DC charging stations more expensive than AC charging stations?
The charging speed of DC charging pile is fast, and the output voltage is high, up to 750V, and the output current is large, up to 480A, so more components are needed to ensure the safety of the whole charging process.And it is directly to charge the battery, and the AC charging pile components are few, the cost is relatively low, the charging speed is slow, is directly to the car charging machine power supply, so the DC charging pile is usually more expensive.However, at present, very few models support AC quick charging, and most models support DC quick charging. Therefore, DC charging piles are often installed in charging stations.Luoyang Grasen 150KW CCS CHADEMO DC Fast Charging Station.

Which EVs are equipped with and compatible with ultra-fast DC charging over 100kW?
1. The audi e – tron
2.DS 3 Crossback
3. The jaguar I – PACE
4. Mercedes EQC
5. Peugeot e – 208
6. Tesla Model 3
7.Vauxhall Corsa
8. Volkswagen ID

Which charging station is called a quick charging station?
Slow charging stations are called AC charging stations.This option takes 7 to 9 hours to charge your electric car.Quick charging stations are called DC charging stations.This option allows you to charge your electric car in up to 1 hour.Luoyang Grasen 150KW CCS CHADEMO DC Fast Charging Station.

How fast is 150kW charging speed?
The total charging time of the 250-kW supercharger is 1 hour and 6 minutes, which is 2 minutes less than the 150-kW charger, which refills the battery from 3% to 100% in 1 hour and 8 minutes.How fast is the car fast charger?The Quick Charger is the fastest way to charge an electric car, offering a range of 60-200 miles in 20 to 30 minutes.

What are the levels and modes for DC quick charging above 100 kW?
Electric car drivers generally understand that "Level 1" means 120 volts at a maximum of about 1.9 kWh, "Level 2" means 240 volts at about 19.2 kWh, and then "Level 3" means DC quick charging.

How much does it cost to install the DC fast charger?
The cost range for single-port EVSE units is $300- $1,500 for Level 1, $400- $6,500 for Level 2, and $10,000- $40,000 for DC quick charging.Installation costs vary by site, ranging from $0 to $3,000 for Level 1, from $600 to $12,700 for Level 2, and from $4,000 to $51,000 for DC Quick Charging.

Which car can be recharged using the DC Level 3 Quick Charger?
Level 3 charging for EVs: Level 3 charging for electric vehicles is available at public charging stations.It's called DC Quick Charging, and it converts AC current to DC current for direct storage in an electric car battery.It is usually rated at 480 volts.

The price of 150KW DC station
Luoyang Grasen Power Technology Co., Ltd is a professional AC home charger and DC fast charger EV supercharger manufacturer for 11 years in China, the charging connectors can be any two of CCS1/CCS2/CHAdeMO/GBT.Please send email to sales@grasen.com for inquiry.